Customer Charges

Customer costs generally vary with the number of customers and include distribution-related investment and related charges that pertain to services, meters, billing, accounting, and information.

 

Delivery Service

That portion of the billing which applies to the charges for services from the transmission and distribution utility (Versant Power).

 

Demand Charges

Demand costs (kW) generally are fixed in nature (cost does not vary with output) and pertain to production, transmission, and distribution plant investment and related associated charges that provide power for a customer's instantaneous need. Instantaneous need may be compared to a customer flicking a switch at any time and the utility has built committed capacity to serve that need.

 

Electricity Supplier

That portion of the billing which applies to the charges for electric energy and capacity from the supplier of your choice.

 

Energy Charges

Energy costs (kWh) generally are variable in nature (cost will vary with output) and pertain to the length of time production facilities and associated charge provide consistent average power. Energy costs will vary depending on the amount of electricity, or kilowatt hours used. 

 

kW

The rate at which electric energy is delivered to or by a system expressed in Kilowatts (kW) at a given instant or averaged over any designated period of time (most common time period of measurement is 15 minutes). The primary source of "Demand" is the power consuming equipment of the customers. 1kW = 1,000 Watts.

 

kWh

The basic unit of electrical energy equal to one kilowatt (kW) of power supplied to or taken from an electric circuit steadily for one hour.

 

Load Factor

The ratio of energy (kWh) supplied to a customer during a number of designated hours (usually a month) divided by the maximum demand and hours in that period. The load factor is used to analyze capacity efficiency for customers. For example, a poor load factor signifies erratic usage on a utility system and as a result this customer would pay a greater percentage of demand charges due to the use of committed capacity to serve the maximum instantaneous need.

             kWh per period   
LF = ---------------------------------------
         kW * 24 hrs * # days in period

Please Identify Your Service Area

Click on your district on the map, or select a zip code or town from the lists.

Select Your District on the Map Below

Maine Public Service District Bangor Hydro District
or

or

Versant Power provides electric delivery service to two areas – the Bangor Hydro District and the Maine Public District.

            The Bangor Hydro District includes Hancock, Piscataquis and Washington Counties and most of Penobscot County.
            The Maine Public District serves Aroostook County and a small piece of Penobscot County.

Because some information varies by District, please identify your District on the map above, or enter your town or zipcode. If you need information on both Districts,  switch back and forth at any time by selecting the district selector button.

If the browser you are using has cookies enabled, you will only have to make this selection once.( If your browser has cookies disabled your selection will be remembered until you close the browser, but not when you return to the site.)