Text Size: A A

Local System Plan


Versant Power makes its local transmission system plan available to the public per the Federal Energy Regulatory Commission (FERC) Order 890. The Chapter 330 filings provided at this link list system needs as well as proposed solutions. Interested parties who wish to provide written comments for Versant Power's consideration should contact:

Steve Sloan, Manager of Transmission Development
PO Box 932 
Bangor, Maine 
04402-0932 
(207) 973-2568