Description of the event: Planned Electrical System Maintenance – Bangor, Washington St. Date and Time of Interruption: Monday 11/25/2024 04:30 AM Duration: 02:00 a.m. for approximately 2 hours Rain Date:(if applicable) Tuesday 11/26/2024 04:30 AM Area Affected: Versant Power crews have scheduled maintenance to the electrical system on Washington Street in Bangor, beginning at 4:30 a.m. on Monday, November 25. The work is anticipated to take approximately two hours to complete. Customers may experience service interruptions during this time as crews work to improve reliability and prevent future outages. Related Information: For your safety: • Motorists are urged to slow down or move over and change lanes, when possible, if approaching utility crews working on roadways. • Never touch a downed power line or a tree in contact with a downed line. • Customers who use generators are reminded to ensure they are used in accordance with manufacturer guidelines at all times. Customers may report outages via our website or by calling our Customer Contact Center at (207) 973-2000. You may also follow us on Twitter (@versantpower), Instagram (versantpower) or LinkedIn.